The Cabildo of Fuerteventura will carry out works in the roundabout of the Costa Antigua industrial estate to alleviate traffic that occurs in the FV-2 section ‘Aeropuerto-Pozo Negro. They propose an urgent solution to the delays on a stretch of road that exceeds 25,000 vehicles of average per day and results in a build up of traffic.

Urgent action consisting of improving access to the Costa Antigua industrial complex is needed before the building of the new road between the airport and Pozo Negro which is still at the planning stage. The President of the Cabildo, Lola Garcia, explains that "we cannot wait for the stretch of the North South Axis 'Aeropuerto-Pozo Negro ' is finished, so from the Cabildo we have sought an urgent solution that immediately alleviates the congestions that occur in this stretch of road of regional interest exceeding 25,000 vehicles of average intensity per day.”

The technical solution raised by the Cabildo de Fuerteventura consists of the creation of a direct outer lane that allows traffic to continue in a south direction without having to cross the roundabout or give way to the turning vehicle to enter the industrial estate. "This will lead to a solution to a problem that has been aggravating and that will allow an improvement in road safety and the traffic jams that occur that generate kilometres of retention," adds the Road Counselor, Blas Acosta.

https://ondafuerteventura.es/obras-en-la-rotonda-del-poligono-industrial-costa-antigua?fbclid=IwAR0azPkwAYNFyzPcRvVFXfFavmJM-VKHc_pR-tLdHTr-i97E6SvIm_85ADk

This topic was modified 4 months ago by Stephen Underwood

   
Quote
Stephen Underwood
(@caletafuerteventura)
Member Admin
Joined: 6 years ago
Posts: 9856

   
ReplyQuote
 Alex
(@alex)
Illustrious Member
Joined: 5 years ago
Posts: 7921
 

End work date ?


   
ReplyQuote
(@johnrgby)
Famed Member
Joined: 5 years ago
Posts: 2294
 

Yes, they have been working??? there for 2/3 months, and as yet it looks no different than it did before, they appear to be leveling the ground as if to widen the road, but I fail to see what that will achieve, other than having shorter ques in two lanes, the problem is traffic coming south that turn into the estate, and how they are going to sort that I have no idea.


   